Powerful Surface Preparation for Industrial and Large Indoor Areas: Floor Self 200
23.05.2026
Dolphinfix is a strong brand offering professional solutions in the fields of construction chemicals, concrete solutions, historical artifact restoration mortars, and thermal, water, and sound insulation systems. With flexible sales options ranging from 1 kg to truckload shipments, a wide product range, and fast supply advantages, it provides reliable solutions from individual applications to large-scale construction site and industrial projects.
In areas such as large warehouses, hangars, industrial production facilities, logistics centers, and large-square-meter hypermarkets, floors are the parts of structures that are most battered and subjected to the heaviest loads. Tons of racking systems, constantly moving forklifts, pallet trucks, and heavy pedestrian traffic require the subfloor to both have a very high load-bearing capacity and progress in a flawlessly flat state.
One of the biggest challenges engineers and contractors face when managing flooring projects in large indoor spaces is the non-homogeneous fluctuations on the concrete surface. While a capillary correction of just 2 mm may be required on one side of a large site, deep depressions and elevation losses reaching 15-20 mm can occur on the other side. Using different materials for these variable thicknesses in projects both complicates site logistics, increases workmanship errors, and leads to a serious loss of time and money. In addition, how the expansion and settlement joints of the building, which absorb movement in such large sites, will be transferred to the new screed surface is a vital engineering issue.
As the leading brand of flooring engineering, Dolphinfix responds completely to these complex and multi-dimensional needs of industrial floors with a single product: 1119 S200 – Floor Self 200 Cement-Based Self-Leveling Screed (1-20 mm). In this final article series, we will explain how to complete your flooring projects with zero errors by examining the management of variable thicknesses in large and industrial areas, the product's power to be used as a standalone floor covering, and critical technical details such as the transfer of expansion joints.
The Challenge Created by Variable Thicknesses and Single-Product Flexibility Management
When examining the concrete surface in large-square-meter projects, floor irregularities do not progress in a linear line. While abrasions and deep hollows form at some points of helicopter-finished screeds or site concrete poured during rough construction, only simple surface roughness remains in other places.
In standard applications in the industry, separate mortars are purchased for thin repairs and separate ones for deep fills. However, this situation causes confusion on the construction site as to which product will be poured where and causes materials to mix with each other.
Dolphinfix Floor Self 200 provides this flexibility on its own thanks to its unique formulation:
- Seamless Transition from 1 mm to 20 mm: The product can be poured in a single casting operation starting from a thickness of 1 mm up to 20 mm (2 cm) with zero cracking risk. Wherever the floor thins out, it thins out there; wherever it deepens, it turns into a thick fill layer there.
- Simplicity in Construction Site Logistics: You can meet the floor leveling needs of the entire site by unloading tons of a single-type product into the project area. This makes material management and labor tracking incredibly easy.
- Homogeneous Drying and Structural Integrity: Since a single material with the same chemical structure is spread across the entire site, the differences in drying time and strength between thick and thin layers remain at a minimal level. This creates a monolithic strength throughout the floor.
Dual-Directional Strength: Both Surface Preparation and Standalone Final Coat Covering
The most striking feature that distinguishes Floor Self 200 from other ordinary self-leveling screeds on the market is the product's flexible functional structure. This product is not just a floor smoothing mortar used under carpet, PVC, or linoleum.
Thanks to the high-performance cements and mineral fillers it contains, Dolphinfix Floor Self 200 can also be left as the sole final floor covering in industrial and semi-industrial areas.
Advantages Provided by Standalone Use
- Economical Industrial Floor: For projects that do not have the budget or time to make an extra very expensive epoxy, polyurethane, or PVC coating on top, Floor Self 200 is poured, dried, and opened directly to industrial use.
- High Abrasion Resistance: Even when left alone, it shows superior resistance to friction and wear effects caused by forklift wheels, heavy pallets, and heavy vehicle traffic. It does not dust.
- Natural Concrete Aesthetics: It brings the exposed concrete and industrial gray appearance, which is frequently preferred in modern architecture, to the surface in its cleanest and smoothest form.
Critical Engineering in Large Sites: Transferring Expansion Joints to the New Surface
One of the biggest contractor mistakes made in large indoor areas is blindly pouring screed over the building's structural movement joints (expansion joints) or cold joints and completely covering them up. Due to building settlement, thermal expansions, and vibrations, these joints are in constant microscopic motion. If you cover these joints with a hard screed layer, it will crack very ugly and deeply right along those joint lines shortly after the screed is poured.
How is Step-by-Step Joint Transfer Performed?
1. Pre-Application Marking
Before starting the screed application, all expansion lines and control joints in the sub-concrete must be precisely marked on the wall edges or column bases.
2. Seamless Pouring of Screed
Floor Self 200 is poured onto the site and spreads under its own level. The tops of the joints are temporarily covered.
3. Timely Joint Cutting
After the screed is poured, when the material reaches the semi-hardened or fully hardened stage (usually within the first 24-48 hours), the joint lines must be re-cut along the joint lines using a floor concrete cutting machine taking the marks on the walls as a reference (joint transfer).
4. Filling with Polyurethane Mastic
These newly cut joint channels must be thoroughly cleaned, and Dolphinfix-approved polyurethane joint sealant mastics that do not lose their flexibility should be applied inside. Thus, as the building moves, your screed will not crack, and the stress will be dampened in the joint gap.
Technical Performance and Strength Data of the Product
Floor Self 200 has high engineering parameters capable of withstanding heavy industrial loads. Typical values obtained under +23°C temperature and 50% relative humidity conditions are as follows:
- Compressive Strength: > 25 N/mm² (High pressure resistance for forklifts and heavy load racks)
- Flexural Strength: > 4 N/mm² (High resistance against dynamic vibrations and floor bending)
- Adhesion to Concrete (Bonding Strength): > 1 N/mm² (Full interlocking to site concrete)
- Liquid Mixture and Pot Life: 15 – 20 Minutes
- pH Value: Approximately 11
- Walkability Time: 12 – 18 Hours
- Topcoat Application Time: 48 – 72 Hours (Depending on application thickness)
Step-by-Step Floor Self 200 Application Method in the Industrial Field
To achieve a flawless finish in large sites, the following operational technical steps should be followed in order:
Step 1: Strong Mechanical Surface Preparation
Surface preparation cannot be left loose in industrial floors. Cement slurry, old epoxy residues, rust, chips, and oil stains must be completely scraped from the surface. In large areas, the floor should be scanned using concrete grinding machines (grinding) or shot-blasting methods, and the massive dust mass that emerges should be vacuumed with high-powered industrial vacuums. The surface should be saturated with water, but no free standing water should remain on the surface.
Step 2: Priming Barrier (Dolphinfix EMC 720 / PAR 721)
In 20 mm thick pours, the absorption of the water in the mortar by the sub-concrete, causing early drying and burning of the screed, must be strictly prevented.
- On absorbent industrial concretes, Dolphinfix EMC 720 Absorbent Surfaces Screed Primer is applied in a single coat, diluted with clean water at a ratio of 1:3; if the floor is very worn and absorbent, a two-coat application is made. Wait 2-4 hours for it to dry.
- On exposed concrete or helicopter-finished glossy concrete, Dolphinfix PAR 721 Glossy Surfaces Screed Primer is preferred for the bonding bridge.
Step 3: Mixing Balance and Consumption Control
For one bag (25 kg) of Floor Self 200, 23% water, which is exactly 5.75 liters of clean water, must be used. To speed up work in large sites, using mortar pumps with mixers approved by Dolphinfix increases labor speed by 5 times. In manual mixing, a lump-free mixture should be made with a low-speed mixer for at least 2 minutes.
Consumption Tip: Dry material consumption is 1.5 kg per m² for 1 mm thickness. You can plan your order accordingly based on your site's average thickness requirement.
Step 4: Flawless Air Evacuation with Spike Roller
After the material is poured by spreading it onto the surface, it is passed over with a steel spatula or an adjustable trowel. Immediately afterward, the spike roller must be run continuously over the mortar to facilitate the exit of all air bubbles inside the material and to achieve the smooth surface texture.
Critical Issues That Applicators Must Pay Attention To
- Never apply at temperatures below +5°C and above +35°C.
- The floor must be protected against the risk of frost, direct sunlight, and severe air drafts for the first 48 hours following the application.
- Mild natural ventilation is recommended during and after the application, but industrial dehumidifiers or fans must definitely not be used for the first two days in order to dry the screed quickly.
Why Should You Choose Dolphinfix for Flawless Floors?
As we clearly saw in this giant four-article guide series (MicroFloor A 1001 MFA, MicroFloor A 1002 MFA, Floor Self 50, and finally Floor Self 200); flooring engineering requires separate expertise according to every thickness, every sector, and every mechanical load expectation.
From casein-free hygiene standards in hospitals to heavy load fills in shopping malls; from fast job deliveries in home renovations to variable thickness management in giant hangars, at every stage of your flooring projects, Dolphinfix is not just a material manufacturer, but your most reliable solution partner.
With our product family whose technical superiority is proven by laboratory tests, our correct primer combinations (EMC 720 / PAR 721), and our expert engineering staff, we completely zero out the risks of cracking, blistering, and out-of-levelness on your floors. To deliver your projects with lifetime performance, saving time and budget, choose the Dolphinfix signature on your floors and step firmly into the future.
Contact Us for the Amount of Product You Need!
From packaging options starting from 1 kg to pallet, tonnage, and truck-based industrial deliveries, Dolphinfix offers reliable supply and technical support in construction chemicals, concrete solutions, insulation systems, and special mortar groups. You for detailed information and offers can visit www.dolphinfix.com.tr or contact our sales representatives.
📞(0212) 945 00 59floor self 200